oscillators

Ronan Fed – EssenceRonan Fed – Essence

Ronan Fed – Essence

Essence size 8.8 MB Essence is a 3 oscillators subtractive polyphonic synthesizer. 3 Multi-Voice Oscillators (1 to 8 voices). 1 Noise…

4 years ago

SynthIV – Luxon

Luxon size 2.5 MB Luxon is a 2 oscillators analog synthesizer. Oscillators are mixed into an amplifier and filter envelope, features…

4 years ago

Surge Synth Team – Surge XT

Surge XT size 80 MB  / 200 MB  / 99 MB Surge XT is a subtractive hybrid synthesizer. Each patch contain…

5 years ago

Sugar Audio – Sawrizor Lite

Sawrizor Lite size 6 MB  / 17 MB Sawrizor Lite is an all-round wavetable / saw synthesizer that combines 2 high quality…

6 years ago

GTG – E-Flex III

E-Flex III size 0.4 MB E-Flex III is a 2 oscillators analog synthesizer. http://www.gtgsynths.com/   E-Flex3  ( 0.7 MB )

6 years ago

Quilcom – Vectomorph

Vectomorph size 3 MB Vectomorph allows the exploration of synthesis using vector oscillators. This oscillator waveform is made up from 4…

6 years ago

Drag

Drag size 3.7 MB  / 5.6 MB Drag is a 4 oscillators polyphonic synthesizer designed for GOA/PSY leads. 4 Oscillators.…

7 years ago

Incubus v1.0

Incubus size 0.82 MB EVM Incubus is a 6 oscillators multiwave synthesizer. Incubus produces a stunning example of a modern…

8 years ago

Microwave Oven v1.0

Microwave Oven size 1.42 MB Microwave Oven is a 3 oscillators arpeggiator synth. https://theodosynthsarchive.wordpress.com/   MicroWaveOven  ( 1.42 MB )

8 years ago

Angel Synth v1.0

Angel Synth size 0.84 MB Angel Synth uses a really original method of generating sound, which is based on the dynamic…

8 years ago